<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Hazy Hills Water Supply Corporation | Water System improvements With the Support From Texas water development board (TWDB)</title>
	<atom:link href="https://hazyhillswsc.org/feed/" rel="self" type="application/rss+xml" />
	<link>https://hazyhillswsc.org</link>
	<description></description>
	<lastBuildDate>Tue, 23 Sep 2025 21:30:31 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0</generator>

<image>
	<url>https://i0.wp.com/hazyhillswsc.org/wp-content/uploads/2025/06/cropped-hhwater-fav-sq.png?fit=32%2C32&#038;ssl=1</url>
	<title>Hazy Hills Water Supply Corporation | Water System improvements With the Support From Texas water development board (TWDB)</title>
	<link>https://hazyhillswsc.org</link>
	<width>32</width>
	<height>32</height>
</image> 
<site xmlns="com-wordpress:feed-additions:1">193510658</site>	<item>
		<title>Water System improvements With the Support From Texas water development board (TWDB)</title>
		<link>https://hazyhillswsc.org/water-system-improvements-with-the-support-from-texas-water-development-board-twdb/</link>
		
		<dc:creator><![CDATA[MRT]]></dc:creator>
		<pubDate>Tue, 13 May 2025 21:20:17 +0000</pubDate>
				<category><![CDATA[Maintenance]]></category>
		<guid isPermaLink="false">https://hazyhillswsc.org/?p=2047</guid>

					<description><![CDATA[DWSRF # 62596 &#8211; New Well and Treatment System Over the past 10 years, The Hazy Hills Water Supply Corporation (HHWSC), City of Spicewood, has had 2 projects with TWDB where we received funding from the Drinking Water State Revolving Fund (DWSRF). The 1st project...]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">                                                                       DWSRF # 62596 &#8211; New Well and Treatment System</p>



<p class="wp-block-paragraph">Over the past 10 years, The Hazy Hills Water Supply Corporation (HHWSC), City of Spicewood, has had 2  projects with TWDB where we received funding from the Drinking Water State Revolving Fund (DWSRF). </p>



<p class="wp-block-paragraph">The 1st project involved 2 Phases. First, being the Design and Planning for a new Water Well to improve capacity. Second, being the construction of the Water Well. The Design and Planning phase was totally funded by TWDB&#8217; DWSRF and was completed in 2018. The water well was constructed and brought online in 2020. This phase was totally  funded by HHWSC. The new Well has improved the water capacity by 2X, allowing the water system to remain operational and meet water guidelines from the Texas Commission on Environmental Quality.</p>



<p class="wp-block-paragraph">The 2nd project involved the demolition of the old concrete water tank. This tank had been decommissioned for over 20 years and has been deteriorating ever since, posing a safety threat. TWDB approved the use of the remaining DWSRF funds from 1st project. The concrete tank was demolished and removed in 2024. This eliminated the safety threat and provided much needed room for future water system expansion.</p>



<p class="wp-block-paragraph"></p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">2047</post-id>	</item>
		<item>
		<title>How Things have Changed!</title>
		<link>https://hazyhillswsc.org/how-things-have-changed/</link>
		
		<dc:creator><![CDATA[MRT]]></dc:creator>
		<pubDate>Thu, 22 Aug 2024 19:17:26 +0000</pubDate>
				<category><![CDATA[Maintenance]]></category>
		<guid isPermaLink="false">https://hazyhillswsc.org/?p=1928</guid>

					<description><![CDATA[It has been over 13 years since the Hazy Hills Neighborhood took over the Water System and the improvements are dramatic. 2011 2024 Thanks to all the Board Members that have volunteered many hours to make this happen.]]></description>
										<content:encoded><![CDATA[
<p class="has-medium-font-size wp-block-paragraph"><strong>It has been over 13 years since the Hazy Hills Neighborhood took over the Water System and the improvements are dramatic</strong>. </p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" fetchpriority="high" decoding="async" width="1024" height="823" src="https://i0.wp.com/hazyhillswsc.org/wp-content/uploads/2020/11/20201109_140627.jpg?resize=1024%2C823&#038;ssl=1" alt="" class="wp-image-514" srcset="https://i0.wp.com/hazyhillswsc.org/wp-content/uploads/2020/11/20201109_140627.jpg?resize=1024%2C823&amp;ssl=1 1024w, https://i0.wp.com/hazyhillswsc.org/wp-content/uploads/2020/11/20201109_140627.jpg?resize=300%2C241&amp;ssl=1 300w, https://i0.wp.com/hazyhillswsc.org/wp-content/uploads/2020/11/20201109_140627.jpg?resize=768%2C617&amp;ssl=1 768w, https://i0.wp.com/hazyhillswsc.org/wp-content/uploads/2020/11/20201109_140627.jpg?resize=1536%2C1235&amp;ssl=1 1536w, https://i0.wp.com/hazyhillswsc.org/wp-content/uploads/2020/11/20201109_140627.jpg?resize=2048%2C1646&amp;ssl=1 2048w, https://i0.wp.com/hazyhillswsc.org/wp-content/uploads/2020/11/20201109_140627.jpg?w=2120&amp;ssl=1 2120w" sizes="(max-width: 1024px) 100vw, 1024px" /></figure>



<p class="has-large-font-size wp-block-paragraph">                                                 <strong>2011</strong></p>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" decoding="async" width="1024" height="516" src="https://i0.wp.com/hazyhillswsc.org/wp-content/uploads/2024/08/20240610_101839-1.jpg?resize=1024%2C516&#038;ssl=1" alt="" class="wp-image-1926" srcset="https://i0.wp.com/hazyhillswsc.org/wp-content/uploads/2024/08/20240610_101839-1.jpg?resize=1024%2C516&amp;ssl=1 1024w, https://i0.wp.com/hazyhillswsc.org/wp-content/uploads/2024/08/20240610_101839-1.jpg?resize=300%2C151&amp;ssl=1 300w, https://i0.wp.com/hazyhillswsc.org/wp-content/uploads/2024/08/20240610_101839-1.jpg?resize=768%2C387&amp;ssl=1 768w, https://i0.wp.com/hazyhillswsc.org/wp-content/uploads/2024/08/20240610_101839-1.jpg?resize=1536%2C773&amp;ssl=1 1536w, https://i0.wp.com/hazyhillswsc.org/wp-content/uploads/2024/08/20240610_101839-1.jpg?w=1988&amp;ssl=1 1988w" sizes="(max-width: 1024px) 100vw, 1024px" /></figure>



<p class="has-large-font-size wp-block-paragraph">                                                  <strong>2024</strong></p>



<p class="has-medium-font-size wp-block-paragraph"><strong>Thanks to all the Board Members that have volunteered many hours to make this happen.</strong></p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">1928</post-id>	</item>
		<item>
		<title>Old Concrete tank has been removed</title>
		<link>https://hazyhillswsc.org/old-concrete-tank-has-been-removed/</link>
		
		<dc:creator><![CDATA[MRT]]></dc:creator>
		<pubDate>Tue, 18 Jun 2024 16:45:54 +0000</pubDate>
				<category><![CDATA[Maintenance]]></category>
		<guid isPermaLink="false">https://hazyhillswsc.org/?p=1800</guid>

					<description><![CDATA[The decommissioned concrete tank has been demolished and removed using the remaining funds from the TWDB Project # 62596]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">The decommissioned concrete tank has been demolished and removed using the remaining funds from the TWDB Project # 62596</p>



<figure class="wp-block-image size-full"><img data-recalc-dims="1" decoding="async" width="1000" height="450" src="https://i0.wp.com/hazyhillswsc.org/wp-content/uploads/2024/06/20240605_172542_resized.jpg?resize=1000%2C450&#038;ssl=1" alt="" class="wp-image-1801" srcset="https://i0.wp.com/hazyhillswsc.org/wp-content/uploads/2024/06/20240605_172542_resized.jpg?w=1000&amp;ssl=1 1000w, https://i0.wp.com/hazyhillswsc.org/wp-content/uploads/2024/06/20240605_172542_resized.jpg?resize=300%2C135&amp;ssl=1 300w, https://i0.wp.com/hazyhillswsc.org/wp-content/uploads/2024/06/20240605_172542_resized.jpg?resize=768%2C346&amp;ssl=1 768w" sizes="(max-width: 1000px) 100vw, 1000px" /></figure>



<figure class="wp-block-image size-large"><img data-recalc-dims="1" loading="lazy" decoding="async" width="1024" height="516" src="https://i0.wp.com/hazyhillswsc.org/wp-content/uploads/2024/06/20240610_101839.jpg?resize=1024%2C516&#038;ssl=1" alt="" class="wp-image-1802" srcset="https://i0.wp.com/hazyhillswsc.org/wp-content/uploads/2024/06/20240610_101839.jpg?resize=1024%2C516&amp;ssl=1 1024w, https://i0.wp.com/hazyhillswsc.org/wp-content/uploads/2024/06/20240610_101839.jpg?resize=300%2C151&amp;ssl=1 300w, https://i0.wp.com/hazyhillswsc.org/wp-content/uploads/2024/06/20240610_101839.jpg?resize=768%2C387&amp;ssl=1 768w, https://i0.wp.com/hazyhillswsc.org/wp-content/uploads/2024/06/20240610_101839.jpg?resize=1536%2C773&amp;ssl=1 1536w, https://i0.wp.com/hazyhillswsc.org/wp-content/uploads/2024/06/20240610_101839.jpg?w=1988&amp;ssl=1 1988w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></figure>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">1800</post-id>	</item>
		<item>
		<title>we have new signs for our water system</title>
		<link>https://hazyhillswsc.org/we-have-new-signs-for-our-water-system/</link>
		
		<dc:creator><![CDATA[MRT]]></dc:creator>
		<pubDate>Sat, 02 Sep 2023 12:01:22 +0000</pubDate>
				<category><![CDATA[Upgrades]]></category>
		<guid isPermaLink="false">https://hazyhillswsc.org/?p=1564</guid>

					<description><![CDATA[]]></description>
										<content:encoded><![CDATA[]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">1564</post-id>	</item>
		<item>
		<title>Generator Transfer Switch installed</title>
		<link>https://hazyhillswsc.org/generator-transfer-switch-installed/</link>
		
		<dc:creator><![CDATA[MRT]]></dc:creator>
		<pubDate>Wed, 26 Jul 2023 15:34:08 +0000</pubDate>
				<category><![CDATA[Upgrades]]></category>
		<guid isPermaLink="false">https://hazyhillswsc.org/?p=1477</guid>

					<description><![CDATA[As part of the Emergency Preparedness Plan, required by the Texas Commission on Environmental Quality, we installed an Automatic Generator Transfer Switch. This will allow us to operate the Water System in the case of a power outage.]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">As part of the Emergency Preparedness Plan, required by the Texas Commission on Environmental Quality, we installed an Automatic Generator Transfer Switch. This will allow us to operate the Water System in the case of a power outage.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">1477</post-id>	</item>
		<item>
		<title>New Pressure Tank</title>
		<link>https://hazyhillswsc.org/new-pressure-tank/</link>
		
		<dc:creator><![CDATA[MRT]]></dc:creator>
		<pubDate>Wed, 26 Jul 2023 15:28:09 +0000</pubDate>
				<category><![CDATA[Maintenance]]></category>
		<guid isPermaLink="false">https://hazyhillswsc.org/?p=1472</guid>

					<description><![CDATA[A new pressure tank has been installed. The original tank was ~50 years old and had deteriorated to the point that it had become a safety hazard.]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">A new pressure tank has been installed. The original tank was ~50 years old and had deteriorated to the point that it had become a safety hazard. </p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">1472</post-id>	</item>
		<item>
		<title>Demolition of Concrete Water Tank</title>
		<link>https://hazyhillswsc.org/demolition-of-concrete-water-tank/</link>
		
		<dc:creator><![CDATA[MRT]]></dc:creator>
		<pubDate>Fri, 04 Nov 2022 23:02:09 +0000</pubDate>
				<category><![CDATA[Upgrades]]></category>
		<guid isPermaLink="false">https://hazyhillswsc.org/?p=1330</guid>

					<description><![CDATA[Demolition of the old concrete water tank has been approved by the HHWSC Board of Directors. Funding to remove the tank will be provided via the remaining unused funds from the Texas Water Development Board Project #62596 and approved by TWDB.]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">Demolition of the old concrete water tank has been approved by the HHWSC Board of Directors. Funding to remove the tank will be provided via the  remaining unused funds from the Texas Water Development Board Project #62596 and approved by TWDB.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">1330</post-id>	</item>
		<item>
		<title>Painting of water tank and building completed</title>
		<link>https://hazyhillswsc.org/painting-of-water-tank-and-building-completed/</link>
		
		<dc:creator><![CDATA[MRT]]></dc:creator>
		<pubDate>Mon, 24 Oct 2022 21:00:39 +0000</pubDate>
				<category><![CDATA[Maintenance]]></category>
		<guid isPermaLink="false">https://hazyhillswsc.org/?p=1237</guid>

					<description><![CDATA[The pump house building and water tank were desperately in need of painting. Earlier this year the Hazy Hills Board of Directors approved it. Painting was completed in October 2022.]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">The pump house building and water tank were desperately in need of painting. Earlier this year the Hazy Hills Board of Directors approved it. Painting was completed in October 2022. </p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">1237</post-id>	</item>
		<item>
		<title>Construction on New Well has been completed!</title>
		<link>https://hazyhillswsc.org/construction-on-new-well-has-started/</link>
		
		<dc:creator><![CDATA[MRT]]></dc:creator>
		<pubDate>Mon, 16 Nov 2020 14:10:28 +0000</pubDate>
				<category><![CDATA[Upgrades]]></category>
		<guid isPermaLink="false">https://hazyhillswsc.org/?p=700</guid>

					<description><![CDATA[Construction on a new well to increase water production has been completed and is now on line. It is currently producing approximately 24 gallons per minute, about 2 times the amount of the existing onsite well. Congratulations to all the Board of Directors that spent...]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph">Construction on a new well to increase water production has been completed and is now on line. It is currently producing approximately 24 gallons per minute, about 2 times the amount of the existing onsite well.  Congratulations to all the Board of Directors that spent the many hours of their time to make this happen.</p>
]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">700</post-id>	</item>
	</channel>
</rss>
