It has been over 13 years since the Hazy Hills Neighborhood took over the Water System and the improvements are dramatic. ...
The decommissioned concrete tank has been demolished and removed using the remaining funds from the TWDB Project # 62596 ...
As part of the Emergency Preparedness Plan, required by the Texas Commission on Environmental Quality, we installed an Automatic Generator Transfer Switch. This will allow us to operate the Water System in the case of a power outage. ...
A new pressure tank has been installed. The original tank was ~50 years old and had deteriorated to the point that it had become a safety hazard. ...
Demolition of the old concrete water tank has been approved by the HHWSC Board of Directors. Funding to remove the tank will be provided via the remaining unused funds from the Texas Water Development Board Project #62596 and approved by TWDB. ...
The pump house building and water tank were desperately in need of painting. Earlier this year the Hazy Hills Board of Directors approved it. Painting was completed in October 2022. ...
Construction on a new well to increase water production has been completed and is now on line. It is currently producing approximately 24 gallons per minute, about 2 times the amount of the existing onsite well. Congratulations to all the Board of Directors that...